Rows Physical Improvements
-
August 2022
Works programme approaching completion
- Recclesia Ltd has been hard at work since January carrying out improvements at locations all over the Rows. They have carried out a range of works including repairs to balustrades to both preserve them and maintain safety on the Rows; restorative decoration to ceilings and walls; stabilising and decluttering walkway bridges; and most recently, overseeing the installation of improved lighting on both the walkway and also the steps. One of the key changes with the lighting is the switch from a ‘cooler’ to a ‘warmer’ temperature. This will help generate a warm ambient feel on the Rows, whilst of course maintaining the light levels required for people’s safety.All the work carried out has relied on a strong partnership between the Council, the HSHAZ partners, and the professional services engaged to help deliver the improvements. We are grateful to all those involved, but a special mention is given to Jim from Recclesia, who you may have seen most recently lugging heavy oak boarding around, and then working on its installation in the Rows stall areas. A big shout out to Jim!
November 2021
Proposed Rows’ Paint Colours
Below is a map identifying the proposed paint colours for the Rows.
The proposed colours are selected from the Dulux Heritage Range which can be viewed here – https://www.duluxheritage.co.uk/en/colours
You can also download a PDF version of the document here – Rows Proposed Paint Colours.pdf
November 2021
Rows Physical Improvements – Enabling Works
Enabling works for the Rows improvements have begun!
Grosvenor Construction, guided by Donald Insall Associates (Conservation Architects) are working at two small sites to investigate what is there, and are applying different finish options for both the stall boards and surrounding walls and ceilings.
Below you can view the samples of these paint and stall finish options: